Swift Hall 3rd and 4th floor Facade Rehabilitation

Construction activities are planned for Swift Hall beginning June 17, to repair and replace damaged fa├žade, complete tuckpointing and apply sealant finishes above the north entrance to the building at the 3rd and 4th floor levels. The work will be noisy at times. Scaffolding and a canopy will be in place at the north building entrance through September 30.


The walkway along the north side of Swift Hall will remain open at all times. Throughout the project, a flagger will be present when materials are hoisted to above ground elevations.

Please direct questions to Desiree DiLucente Facilities Services senior project manager, at ddilucente@uchicago.edu, or 773-702-3447, or Larry Blouin, Facilities Services, lblouin@uchicago.edu, 773.230.3261.

Thank you for your patience.